Notice after Concrete Mixer Finishing Work

By dwkelly ~ July 13th, 2016 @ 7:44 am

Notice after Concrete Mixer Finishing Work

Some customers hold the point that closing down is enough to concrete mixer after working, which has turned out to be wrong. The potential safety hazard can be eliminated and good equipment condition can be guaranteed only when concrete mixer is maintained carefully after working. So, what are matters that should be noticed after operation?

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:small concrete batching plant,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc.Firstly, when the work is finished Planetary Concrete Mixer manufacturer, gate of bulk cement dump should be closed tightly. Concrete left within pipeline should be completely delivered out so that no concrete will remain in the pipe. At the same time, the machine and construction site need to be cleared thoroughly.

Secondly, concrete attached to mixing drum of concrete mixer must be cleaned up. What’s more, operator needs to maintain the machinery and lubricate all the lubricating points.

Thirdly, mortar and dust on every part of concrete mixer should be cleared. To keep clean, dust falling in the drum or on surface of the machine and concrete or oil contamination attached to concrete mixer should be disposed timely, which means that concrete left within concrete mixer must be cleaned out timely and entirely after production. In addition, all pilot switches should be in off status and power switches must be off.